Dust Suppression
Equipment Rental.

Construction dust isn't just an environmental issue, it's a regulatory one. RCRC now enforces SAR 50,000 fines per violation on sites 2,000 m² and above. We rent you every piece of equipment you need, delivered, installed, and maintained.

28+
Years in KSA
24h
Deployment
100%
RCRC Compliant

RCRC regulations are now enforced.SAR 50,000 fine per violation + stop-work orders & project delays

SAR 50,000
Per Violation

RCRC Enforcement Is Now Active

The Royal Commission for Riyadh City, in collaboration with the National Center for Environmental Compliance (NCEC) and Riyadh Municipality, has announced 11 binding regulatory requirements to control fugitive dust emissions. All construction projects in Riyadh with a total area of 2,000 m² or more must implement approved dust control procedures or face penalties of up to SAR 50,000 per violation, stop-work orders, and project suspension.

Read the official RCRC announcement →
THE REGULATION
Why Dust Control Is Now
Non-Negotiable in Riyadh

The Royal Commission for Riyadh City (RCRC) and National Center for Environmental Compliance (NCEC) have issued binding dust mitigation requirements for all construction activities. Every site must comply or face enforcement.

Monitoring Requirements

Real-time PM₁₀ dust monitoring is mandatory for medium and high-risk construction sites, with 2-minute live logging linked to the RCRC/NCEC unified dashboard via GSM.

Logging FrequencyEvery 2 Minutes
Medium Risk Sites1+ Stations
Large / Mega Sites2+ Stations
Camera Storage90+ Days

Wind Speed Thresholds

Operations must adapt in real-time to wind conditions. Exceeding thresholds without proper suppression triggers automatic alerts and potential stop-work orders.

Normal Operations< 15 km/h
Enhanced Suppression15–25 km/h
Activity Suspension> 25 km/h
Anemometer Height2–3 meters

Site Entry & Exit Controls

Wheel-wash or submerged rumble racks are mandatory at every exit. No visible trackout is permitted beyond 15 meters from the gate.

Wheel-Wash Duration≥ 20 sec/axle
Rumble Rack Length≥ 8 meters
Trackout CleanupWithin 15 min
Clean Zone After Gate15 meters

Material & Stockpile Rules

All exposed surfaces, stockpiles, and idle areas must be covered or stabilized. No batching or stockpiles within 200m of schools, hospitals, or mosques.

Max Pile Height≤ 3 meters
Bucket Drop Height≤ 1.5 meters
Sensitive Area Buffer200 meters
Idle StabilizationAfter 5 days
Equipment for Rent
Everything You Need.
One Rental Partner.

Purpose-built dust suppression equipment available for short-term or long-term rental. Delivered, installed, and maintained by our team. No capital expenditure, no ownership headaches.

Water misting cannon suppressing dust on a construction site
01

Water Misting Cannons

High-pressure misting systems with 20–30 meter spray range. Suppresses airborne dust particles at the source during demolition, earthworks, and material handling.

Rental • Demolition • Earthworks
Automated wheel-wash system at construction site entrance
02

Wheel-Wash Systems

Automated pressure-wash stations with water recycling. 20+ seconds per axle, closed-loop system with sand traps and sludge capture. RCRC compliant.

Rental • Entry & Exit Points
PM10 air quality monitoring station with sensors
03

PM₁₀ Monitoring Stations

Real-time particulate matter sensors with wind speed/direction, GSM connectivity, and direct feed to the RCRC/NCEC unified dashboard. Includes calibration and data logging.

Rental • All Sites • Mandatory
Vacuum road sweeper cleaning construction site road
04

Vacuum Road Sweepers

Wet-vacuum sweeping machines for on-site roads and adjacent public roads. Daily sweeping keeps your site compliant and prevents trackout fines.

Rental • Roads & Perimeter
Water spray truck dampening roads at construction site
05

Water Spray Trucks

Tanker trucks equipped with rear sprayers and side nozzles for continuous road dampening, stockpile wetting, and excavation misting across large sites.

Rental • Roads & Stockpiles
Wind barriers and dust fencing on construction perimeter
06

Wind Barriers & Fencing

Engineered wind screens positioned at 10–15× pile height downwind. Reduces wind erosion on stockpiles, crushers, and exposed soil by up to 80%.

Rental • Stockpiles & Perimeter
Geotextile covers on construction stockpiles
07

Geotextiles & Tarp Covers

Heavy-duty sheeting and geotextile covers for idle stockpiles, exposed soil, and construction waste. Quick to deploy, reusable, and weather-resistant.

Rental • Stockpiles & Idle Areas
Fogging mist spray system at crusher conveyor point
08

Fogging & Mist Sprays

Fine-mist fogging systems for crusher areas, conveyor transfer points, and loading zones. Creates a moisture curtain that captures dust before it becomes airborne.

Rental • Crushers & Conveyors
Submerged rumble rack at construction site exit
09

Rumble Racks (Submerged)

Underwater rumble racks with anti-slip surfaces, 8+ meter effective length, sump for sludge capture. Alternative to wheel-wash for high-traffic exits.

Rental • Entry & Exit Points
Dust suppressant chemical polymer spray application
10

Dust Suppressant Sprayers

Polymer and chemical dust suppressant application systems. Creates a binding crust on unpaved roads and exposed soil that lasts 2–4 weeks per application cycle.

Rental • Roads & Open Areas
Mobile dust suppression unit on construction site
11

CCTV & Site Cameras

RCRC-mandated surveillance cameras with 90+ day cloud storage. Provides visual evidence of compliance measures and real-time site monitoring for inspectors.

Rental • All Sites • Mandatory
Anemometer wind speed monitoring station
12

Anemometers & Weather Stations

Wind speed and direction monitoring at 2–3m height. Triggers automatic alerts at 15 km/h for enhanced suppression and at 25 km/h for activity suspension.

Rental • Medium & High Risk Sites
Applications
Dust Control for Every
Construction Activity

The RCRC guidelines address 11 distinct dust-generating activities. Each requires specific equipment and mitigation measures. We cover them all.

01

Site Preparation & Earthworks

Grading, excavation, and land clearing generate massive dust plumes. Fine mist sprays must maintain visibly damp surfaces without pooling.

Water misting cannons during excavation
Designated gravel roadways before work begins
Stabilize idle areas after 5+ days inactivity
02

On-Site Roads & Traffic

Vehicle movement is the largest single source of dust on construction sites. Unpaved roads must be treated daily and speed limits strictly enforced.

Daily water truck spraying on unpaved roads
Speed limit: ≤10 km/h unpaved, ≤20 km/h paved
Vacuum sweeping adjacent roads hourly
03

Demolition Works

Demolition produces dense dust plumes, especially in dry desert air. Continuous misting and spray cannons with 20–30m range are required on large sites.

Continuous misting during demolition
Suspend operations when wind exceeds 15 km/h
Active demolition ≤100 m² concurrently
04

Crusher & Batching Areas

Crushers are major point sources of dust, continuously producing emissions from feeding, crushing, transfer, and discharge operations.

Enclosed units with fogging sprays at feeders
Covered conveyors with misting sprays
≥500m buffer from residential areas
05

Material Handling & Stockpiles

Thousands of tonnes of soil, aggregate, and sand are moved daily. Uncovered stockpiles act as dust reservoirs, emitting continuously in wind events.

Cover idle piles with tarps or geotextiles
Pile height ≤3 meters, rounded forms
Wind barriers at 10–15× pile height
06

Construction Waste Transport

Waste trucks must be covered without exception. Trackout of debris onto public roads triggers complaints, fines, and enforcement actions.

Tarpaulins overlapping ≥30cm on all sides
Mist waste before loading/dumping
Waste trucks never overloaded
How Renting Works
From Call to Compliant
in 24 Hours

Site Assessment

Tell us your project type, site size, and risk category. We'll recommend the exact equipment package you need for full RCRC compliance.

Custom Rental Package

We configure a rental package tailored to your site, from misting cannons and monitors to wheel-wash systems and road sweepers. No purchase needed.

Delivery & Setup

Equipment delivered to your site, installed, connected to the RCRC/NCEC dashboard, and tested. Your team receives a full operational briefing.

Ongoing Maintenance

Maintenance, calibration, water supply coordination, and replacement units on standby. All included in your rental. We keep you compliant for the life of your project.

Compliance Made Simple
One Call. Full
RCRC Compliance.

Stop worrying about which regulations apply to your site. We've mapped every RCRC requirement to specific equipment, so you don't have to.

+966 11 504 8541

PM₁₀ Real-Time Monitoring

Sensors installed, calibrated, and linked to the RCRC/NCEC dashboard before construction begins

Wheel-Wash at Every Exit

Automated systems with water recycling. Zero visible trackout beyond 15m from gate

Road Dust Suppression

Water trucks and vacuum sweepers for unpaved site roads and adjacent public streets

Stockpile & Surface Coverage

Tarps, geotextiles, and wind barriers deployed to all idle areas and material storage zones

Demolition & Crusher Suppression

Misting cannons, fogging systems, and enclosed conveyors for high-emission operations

Why Rent From Eijarat
Rent. Don't Buy.
Stay Compliant.
01

Zero Capital Expenditure

No upfront purchase costs. Convert a large capital expense into a predictable monthly rental fee that fits your project budget.

02

Maintenance Included

All servicing, calibration, and repairs are covered. Equipment breaks down? We replace it within hours. No downtime, no extra cost.

03

Flexible Duration

Rent for weeks, months, or the full project lifecycle. Scale up or down as your site phases change. No depreciation, no storage worries.

04

Expert Operators Available

Need trained operators? We provide experienced crews for water trucks, sweepers, and monitoring systems. Fully managed dust control on demand.

Get Started Today

SAR 50,000 Per Violation.
Don't Risk It. Rent Now.

Every day without proper dust control is a day your project is at risk. One violation costs more than months of rental. Call us or email, and we'll have equipment on your site within 24 hours.